Facility

With considerable time and effort, we designed our 34,000 square foot building to be used specifically for the application of functional coatings. Our extensive experience was instrumental in determining the features that would help us improve workflow, provide the handling / processing precautions important to our customers, reduce our impact on the environment and allow us to advance along with the latest technology.

Security

As an ITAR registered company, numerous security measures, including the use of surveillance cameras and the availability of locked storage areas, have been taken to ensure the safety of sensitive customer product.

Environment

Temperature and humidity are monitored and controlled through the use of multiple air make-up units. Each spray booth uses its own dedicated unit to guarantee the optimal conditions for the application of each specific coating type.

ESD

Protecting our customers’ circuit board assemblies from electrostatic discharge was a top priority in the design and outfitting of our facility. Conductive flooring and multiple paths to earth ground were incorporated throughout the building to guarantee the effectiveness of our extensive ESD system. The system is based on ANSI/ESD S20.20 – 1999 and includes ESD awareness training and the use of ESD wrist straps, heel straps and lab coats. In addition, all work surfaces, handling trays and carts are constructed of static dissipative material and are tested regularly.

Equipment

  • Hand Spraying:

    • 6 separate production spray booths dedicated by coating type
    • 2 touch-up booths
    • 1 booth dedicated to R&D project work
    • A variety of HVLP spray guns are utilized

  • Automated Coating:

    • Asymtek C740 computer controlled selective coating machine. This unit is complete with a board inverter and an infrared oven.

  • Curing
    • Conventional ovens: 11 forced convection ovens.
    • Infrared: Nordson Select Cure Infrared oven.
    • UV: Dymax UVC-12 uv cure oven.

Photo gallery >>

 
 
 

June 21 & 22, 2011

Jaro Corp will be attending the AmCon Design & Contract Manufacturing Expo on June 21-22, 2011.

February 26, 2011

Jaro Corp’s Quality Control Dept. is now certified to IPC-A-610 Acceptability of Electronic Assemblies.

September 22, 2010

Jaro Corp.'s new brochure is now available for download!

November 12, 2009

Jaro Corp. registers with the Online Representations and Certifications Application (ORCA).

October 22, 2009

Jaro Corp. registers with the U.S./Canada Joint Certification Program (JCP).

October 1, 2009

Jaro Corp. holds Open House! Click here for photos.

October 1, 2009

Jaro Corp. launches new website.

July 23, 2009

Jaro Corp receives ISO9001 & AS9100 certification.
 
    Contact Us    |    Directions    |    Download our Brochure    |    Site Map    |    Request a Quote

© 2011 Jaro Corp